Feb 24th, 2023
by John Donovan.
Comments are off for this post
…problems included repeated outages at its Prelude liquefied natural gas (LNG) facility off the western coast of Australia…
REUTERS
Shell CEO creates chief of staff role in management overhaul
By Ron Bousso: February 23, 2023: 4:15 PM GMT
LONDON, Feb 23 (Reuters) – Shell (SHEL.L) Chief Executive Officer Wael Sawan has created a senior role of chief of staff as part of a management overhaul to improve performance after technical problems and other disruption, three company sources said.read more
Jan 24th, 2023
by John Donovan.
Comments are off for this post
The most recent incident happened only a year after a similar fire forced the vessel to go down for nearly five months.
Shell’s Prelude FLNG Restarts First Cargo Since Fire
Zacks Equity Research:
Shell SHEL recently announced the restart of liquefied natural gas LNG cargoes from its Prelude floating LNG FLNG facility offshore Australia, following a temporary fire-related technical outage in December.
According to Shell, the fire was promptly put out and the area was declared safe; it also stated that no one was hurt and all of the facility’s workers were safe and well.
Following a small fire at the 3.6M metric tons/year facility, Prelude, the largest floating plant for natural gas liquefaction in the world, had paused its gas production last month due to an ongoing investigation.read more
Jan 18th, 2023
by John Donovan.
Comments are off for this post
RIGZONE
Prelude FLNG Loads Out First Cargo Since Fire
by Bojan Lepic| Rigzone Staff| Wednesday, January 18, 2023
Even though Shell has not confirmed any restart on its massive Prelude FLNG, Reuters reported that the Methane Becki Anne LNG tanker has begun loading.
The Methane Becki Anne was the first LNG tanker to berth at Shell’s Prelude floating LNG site off Western Australia since it was shut down after a fire.
According to Reuters, the LNG carrier vessel berthed at the Prelude plant on January 17, Refinitiv ship-tracking data showed. Refinitiv’s data also showed that LNG has already begun loading.read more
Dec 22nd, 2022
by John Donovan.
Comments are off for this post
Report: Output from Shell’s Prelude FLNG Shut Again
BY Bartolomej Tomic, managing editor of Offshore Engineer.
December 22, 2022
Shell has stopped production at its Prelude floating LNG plant off Western Australia after a fire.
A Shell spokesperson told Reuters on Thursday that the fire at the giant FLNG unit “was rapidly extinguished.”
The 488-meter-long, Shell-operated, Prelude FLNG unit forms part of an offshore development that produces natural gas from the remote namesake field, located approximately 475 km north-northeast of Broome in Western Australia. The Prelude is the world’s largest FLNG unit.read more
Nov 3rd, 2022
by John Donovan.
Comments are off for this post
Bloomberg
Shell Seeks Acquisitions to Bolster Australia Power Presence
James Fernyhough:
(Bloomberg) — Shell Plc is targeting acquisitions in Australia in its bid to become an integrated energy provider.
The London-based oil major is looking for a “step change” in its Australian presence from electricity generation to retail, including building up “significant battery positions,” Greg Joiner, chief executive officer of Shell Energy Australia, said in an interview.
Shell, which last week reported its second-highest earnings on record, is one of Australia’s biggest liquefied natural gas exporters, but is seeking to diversify away from fossil fuels and become the world’s biggest power company. The company has already made a string of acquisitions in Australia in recent years, including generation company ERM Power Ltd., retailer Powershop, and a stake in windfarm developer WestWind Energy Development Pty.read more
Sep 19th, 2022
by John Donovan.
Comments are off for this post
argusmedia.com
Shell restarts Australian Prelude LNG loadings
Published date: 19 September 2022
Shell has resumed LNG loadings at its 3.6mn t/yr Prelude floating LNG (FLNG) facility in the Browse basin offshore Western Australia following a shutdown of more than six weeks because of industrial action.
The resumption comes more than three weeks since the strike, which began on 10 June, stopped on 25 August.
The shipments follow the cancellation of protected industrial action after an in-principle enterprise agreement was reached with the Australian Workers’ Union and Electrical Trades Union in relation to the Prelude facility on 23 August, Shell said on 19 September.read more
Sep 19th, 2022
by John Donovan.
Comments are off for this post
Shell’s Prelude FLNG off Australia resumes LNG production, shipments
Sameer Manekar:Reuters: PUBLISHED SEP 18, 2022 06:19PM EDT
Sept 19 (Reuters) – Shell Plc SHEL.L said on Monday it has resumed producing and shipping liquefied natural gas (LNG) from its Prelude floating LNG (FLNG) facility, nearly a month after the oil and gas major and workers’ unions reached a wage deal.
In late August, Shell and unions representing workers at the floating facility off northwest Australia reached the deal, ending a long-running strike that had shut down the 3.6 million-tonne-a-year facility in July and halted LNG supplies.read more
It resulted in Shell stopping shipments and suspending activity aboard
Shell and unions say they are happy to have finally reached an agreement
Industrial action aboard Shell’s floating LNG facility Prelude is set to come to an end after unions and the company reached an in-principle enterprise agreement for workers.
The industrial action, which began in early June, led to Shell putting a halt to shipments leaving the facility 400 kilometres off the Kimberley coast and a shutdown in production amid soaring gas prices.read more
Shell’s giant floating gas production plant off Australia is to remain shut until at least early September after strike action was extended, compounding the global supply crunch.read more
Aug 15th, 2022
by John Donovan.
Comments are off for this post
Shell Postpones Prelude LNG Turnaround Until Next Year
Zacks Equity Research
Shell plc SHEL recently stated that it is deferring the planned maintenance work at the Prelude floating liquefied natural gas facility, which was due to begin in September. The postponement came following the continued industrial action at the site situated off northwest Australia.
A Shell spokesperson mentioned in emailed comments, “As a result of the ongoing Protected Industrial Action and inability to complete preparation work, we are not able to proceed with the planned turnaround at this time.”read more
Over 530 yards long, 80 yards wide, more than 300 feet tall, and 660,000 tones heavy. The largest floating structure the world has ever put out to see is the Prelude offshore natural gas facility. Completed in under five years, the colossal ship-looking titan is made to work a quarter of a century in rough South Pacific waters.read more
Aug 12th, 2022
by John Donovan.
Comments are off for this post
…it is the World’s most expensive and at the same time, the most unreliable Offshore installation ever built…
COMMENT SENT TO JOHN DONOVAN ABOUT THE ILL-FATED SHELL PRELUDE PROJECT BY BILL CAMPBELL, RETIRED HSE GROUP AUDITOR, SHELL INTERNATIONAL
Seems such a long time ago since we watched the Hollywood quality videos of a happy bunch of comrades in arms assembled in a circle on the helideck. Halcyon days indeed.
The future then was so hopefull, and filled with promise.
Almost hidden in the article re the industrial dispute was the report of a loss of LNG during transfer operations, I have stressed and explained many times why this simply cannot be allowed to happen and as you publish repeatedly, in your Prelude banner against my name, I predicted many moons ago that loss of hydrocarbons from Prelude was almost inevitable.read more
Shell has delayed major maintenance on its troubled Prelude floating gas facility after negotiations over the weekend failed to end two months of industrial action.
The delay is another setback for Shell, which spent about $US17 billion ($24 billion) to build the world’s largest vessel that has suffered a multitude of production outages and serious safety issues since it arrived in West Australian waters five years ago.read more
The company blamed a lack of assurance from unions that safety functions would be carried out
Union representatives said the claims were a “red herring” and they would not endanger safety of workers at the rig
Industrial negotiations proposed via mediation ground to a halt
Shell has scrapped plans to lock workers out of its multi-billion dollar offshore gas facility, Prelude, citing safety concerns.
Workers onboard the facility 400 kilometres off Western Australia’s Kimberley coast are engaged in protected industrial action in a bid to push for better wages.
The Anglo-Dutch energy giant shut down the facility and suspended production in response to strikes earlier this month.read more
Jul 20th, 2022
by John Donovan.
Comments are off for this post
Shell to enforce lockout on Prelude as industrial dispute escalates
Sean Smith: The West Australian: Wed, 20 July 2022 9:57AM
The dispute over a new pay deal on Shell’s Prelude floating LNG plant off north-west WA has escalated again, with the energy giant flagging it will lock out workers from Monday.
The decision means those workers who are not on Prelude but support the protected industrial action by the Offshore Alliance will not be paid.
Those still on Prelude will only be paid for the time they work outside industrial stoppages.read more
Jul 13th, 2022
by John Donovan.
Comments are off for this post
Shell (SHEL) to Shut Prelude FLNG Over Industrial Dispute
Zacks Equity Research: Wed, July 13, 2022, 11:16 AM
Shell plc SHEL announced that it would not be able to supply liquefied natural gas (“LNG”) cargoes from its Prelude facility to its customers as the company would completely shut down its Prelude FLNG vessel, offshore Western Australia, due to unions’ escalating industrial action, which has now been extended to Jul 21.
The Offshore Alliance, which is made up of 150 union members earning more than $200,000 a year, told Shell that the workers intended to ban mooring tankers, alongside the vessel, as part of their protected action this week. The ban will disallow SHEL from unloading LNG and LPG from its storage tanks, which are anticipated to reach full capacity going forward.read more
Listen and read proof in audio and transcript form of Shell CEO Ben van Beurden’s cover-up tactics in the OPL 245 Nigerian corruption scandal. The instruction given by him in the covertly recorded call to CFO Simon Henry was at odds with Shell’s claimed core business principles. Cover-up and obstruction, instead of transparency and integrity, says Shell critic John Donovan
JOHN DONOVAN TV DOCUMENTARY INTERVIEW
SHELL EXECUTIVES AT THE CENTER OF A SCHEME TO STEAL $1.3 BILLION FROM NIGERIA’S PEOPLE
SHELL ADMITS DEALING WITH NIGERIAN MONEY LAUNDERER – BBC NEWS
SHELL, ENI AND NIGERIAN OFFICIALS IN OPL 245 CORRUPTION SCANDAL
INVESTIGATION OF OPL 245 NIGERIAN OIL CORRUPTION SCANDAL
DUTCH EARTHQUAKES CAUSED BY SHELL/EXXON
SHELL KILLS FOR OIL IN NIGERIA
ESTHER KIOBEL: EVIL OIL GIANT SHELL COLLUDED IN THE EXECUTION OF MY INNOCENT HUSBAND
ESTHER KIOBEL SUES SHELL FOR COMPLICITY IN HUSBANDS MURDER
SHELL LIED ABOUT CLEANING UP OIL IN NIGER DELTA
SHELL SPIES INFILTRATED NIGERIAN GOVERNMENT
LEGO DROPS SHELL OVER GREENPEACE OIL SPILL VIDEO
SHELL ARCTIC DRILLING ACCIDENTS
SHELL KNEW ABOUT CLIMATE CHANGE DECADES AGO
ABANDONED BY SHELL: KEITH MACDONALD & FAMILY, VICTIMS OF RADIOACTIVE CONTAMINATION AT WORK
ROYAL DUTCH SHELL FOUNDER SIR HENRI DETERDING, NAZI FINANCIER
JOHN DONOVAN PROMOTIONAL GAMES FOR SHELL AND OTHER CLIENTS
EBOOK TITLE: “SIR HENRI DETERDING AND THE NAZI HISTORY OF ROYAL DUTCH SHELL” – AVAILABLE ON AMAZON EBOOK TITLE: “JOHN DONOVAN, SHELL’S NIGHTMARE: MY EPIC FEUD WITH THE UNSCRUPULOUS OIL GIANT ROYAL DUTCH SHELL” – AVAILABLE ON AMAZON. EBOOK TITLE: “TOXIC FACTS ABOUT SHELL REMOVED FROM WIKIPEDIA: HOW SHELL BECAME THE MOST HATED BRAND IN THE WORLD” – AVAILABLE ON AMAZON.
DISCLAIMER
This is not a Shell website. That fact should be abundantly plain from the overall content of this home page and our sister Shell focussed websites, including shellnazihistory.com. Click on the Disclaimer link at top of this page for more information. You Can Be Sure Shell does not endorse or approve of this website. There are no subscription charges nor do we solicit or accept donations. It is an entirely free to use website drawing attention to the negative side of Shell while also publishing positive news about the company. The Shell logo image with the white text used on this website, as per the above example, is in the public domain because its copyright has expired and its author is anonymous. It can be found here on WIKIMEDIA COMMONS. Our shellenergy.website republishes Shell Energy customer complaints posted on Trustpilot where there is an ample supply. Use this link for Shell’s own website.
OVER 500 EXTERNAL PUBLICATIONS CITING OUR SHELL WEBSITES
See our link list of over 500 articles by the FT, Wall Street Journal, Reuters, Bloomberg, Forbes, Dow Jones Newswires, New York Times, CNBC etc, plus UK House of Commons Select Committee Hansard records, information on U.S. Securities & Exchange Commission websiteetc. all containing references to our Shell focussed websites, or our website founders Alfred and John Donovan. Includes TV documentary features in English and German, newspaper and magazine articles, radio interviews, newsletters etc. Plus academic papers, Stratfor intelligence reports and UK, U.S. and Australian state/parliamentary publications, also citing our Shell websites. Click on this link to see the entire list, all in date order with a link to an index of over 100 books also containing references to our non-profit websites and/or our activities.
John Donovan, the website owner